Questions & Answers


About the Questions & Answers category (4)
Create a Summary metrics (1)
Backlog readiness (1)
Tempo Teams are associated with Issues rather than Work Logs (1)
Story points planned at Sprint start date while Sprint is in progress (2)
Import Bamboo plans / builds / distributions (17)
Report which provides a breakdown by assignee of the number (1)
Updating Profields Custom Fields in Advanced Settings (1)
Ability to filter Sprint in Pages > 2018-12-01 (1)
How to get linked issue property to Parent issue (1)
How to calculate cost of linked issues? (3)
DefaultMember in calculated member (1)
Total column calculation (1)
Limit data shown to the last 6 months (3)
Rounding Up & Modulo (1)
Average age of Sub-tasks in issues in Epic (1)
How do I remove unrelated users from Assignee list drop down for reports (1)
Stacked Bar Chart For Roll-Up of Stories into New Feature Issue Type in Jira (1)
Group a row item based on info present into another issue (1)
About query performance of the report (4)
Get count of minor versions of fix version per one major (1)
Limit the time period of a cumulative issue sum (1)
Planned vs delivered issues in last 5 sprints (1)
Exclude specific labels (6)
How calculate issues which was in status, but now in different status (1)
Custom time levels (6)
How to find Cumulative hours spent between two dates by Transition? (4)
How to sum up Epic Links (5)
Working with the Calculated Measures of Issues at the top levels (Assignees, Project) (1)
Historical data display (1)