thanks. this helps. i think my problem is i have the data backwards. Any advice? I have 20 some epics with the same 3 stories each. i am trying to graphically show progress of each epic with the ‘finish line’ 3 issues completed in the epic as the horizontal line. the calculated field is showing as duplicated data?