I’m building an eazybi report, to get the epics worked in the current Q.
From those epics, I’m interesting to know the sprint story points assigned during the sprints closed in the current Q.
My big question is how can I know the number of issues in that sprint, with no story points (empty).
I see the epics if I add “sprint issues at closing”, but I can’t know from that number, which are with 0 SP.
Thanks in advanced for your help.