Hello,
I need a bit of help if possible. I am trying to create a report in easyBI to capture the Velocity of each indivudal engineer on my teams per sprint. My company has our state of measure to be in hours vs. points (which I wish was the other way around and we estimated using points). If anyone has a how-to on this or can at least point me in the right direction to figure this out, that would be much appreciated.
Thank you,
-Brett